January 1971 | Technical Memorandum OT ITS TM 23

A site selection study for a U. S. Coast Guard, East Coast, long range radio station, Part 2 of 2

Cite This Publication

Jean E. Adams and Dale N. Hatfield

Abstract: The three sites selected by USCS as a result of Part 1 have been simulated in combination with the seven existing radio stations. The HF (4-22 MHz) predicted performance for all such combinations has been computed for the worst case propagation conditions. The overall performance for the simulated communication system has been evaluated in terms of (1) total system reliability, (2) station utiliza­tion in the system, (3) the effectiveness of coverage of the ocean areas, (4) the redundancy of coverage both as a function of geographical distri­butions and the percentage of simulated ship locations in each redundancy level, (5) effect of MF coverage at Northwest-Pungo, (6) effect of casualty at Northwest, and (7) effect in reducing number of operating stations. Based on this propagation analysis it is concluded that the new site s are ranked (1) Northwest-Pungo, (2) La Plata-Washington, (3) Sugar Grove­LaPlata. With the addition of the new site, HF communication functions at Radio Washington and New York can be deactivated with little impact on HF coverage.

Disclaimer: Certain commercial equipment, components, and software may be identified in this report to specify adequately the technical aspects of the reported results. In no case does such identification imply recommendation or endorsement by the National Telecommunications and Information Administration, nor does it imply that the equipment or software identified is necessarily the best available for the particular application or uses.

For questions or information on this or any other NTIA scientific publication, contact the ITS Publications Office at ITSinfo@ntia.gov or 303-497-3572.

Back to Search Results